Resources / Interactive tool
What does later delivery cost?
Shape the opportunity. Compare two delivery dates. See the value lost between them.
This curve shows expected total value if delivered on a particular date. It is not the cost to build the feature, or revenue earned each week.
A demo before the show. Links afterwards.
The starting example is worth AUD 50,000 before the show, then AUD 10,000 from sharing links afterwards. Crossing the deadline loses AUD 40,000. These are illustrative figures, not a forecast.
The curve is an assumption to test.
Keep the comparison fair
Estimate net opportunity value over the same stated horizon. Include attributable benefits, running costs, adoption and probability. Separate implementation cost when assessing whether to invest.
Try a range
Change the starting value, residual and timing to test lower and higher estimates. A smooth curve does not make an uncertain estimate precise.
For benefits earned per week, compare the accumulated benefits of earlier and later delivery. That is a different model. See the steady-benefit worked example and worksheet.
Comparing several pieces of work? Try the feature sequencing simulator →
Further reading
The value and urgency concepts draw on Black Swan Farming's Cost of Delay introduction and urgency profiles. These curve equations and the show example are original modelling choices, not a reproduction of their diagrams or a prescribed forecasting method.